Slot 02 · Nutanix · Dec 2024 – Oct 2025 · Technical lead

Keeping customers through VMware’s licensing shake-up

VMware’s new licensing forced about 2,000 enterprise customers running Nutanix on VMware to pick one full stack. I led Nutanix Move’s in-place ESXi-to-AHV conversion across three teams, built for zero downtime and shipped on time. About half of those customers stayed with Nutanix.

StageClearOn time

Animation of an in-place conversion on a three-node cluster. One node at a time, its virtual machines move to the other nodes, the node is brought down and reimaged with AHV, and the virtual machines are converted onto AHV as they move back. The workloads stay the same throughout; only the hypervisor under them changes from VMware ESXi to Nutanix AHV.

Coloured cubes are the customer’s workloads: they never change.Grey is ESXiindigo is AHV

Results

Retention~50%

of affected customers stayed with Nutanix

At stake2,000

enterprise customers on Nutanix + VMware

Revenue at risk$10–20M

if the release slipped

DeliveryOn time

shipped Sep–Oct 2025

Cycle time~20%

shorter after fixing the QA bottleneck

Mission

The problem

Many Nutanix customers ran a mixed stack: Nutanix software on top of VMware’s ESXi hypervisor. After Broadcom acquired VMware, it changed the licensing so customers had to buy the complete package. Partial subscriptions were gone.

That left about 2,000 enterprise customers with a choice: go all-in on VMware, or move fully to Nutanix. With the new pricing, many wanted to stay with Nutanix. The blocker was the move itself: switching every workload from ESXi to Nutanix’s own hypervisor, AHV, without downtime.

Nutanix needed a product that made that switch seamless, and needed it before customers made their decision.

Boss fights

The hardest parts

Three teams, three roadmapsBoss 1

The conversion depended on AHV, Networking and Uhura, each with its own priorities. The customer timeline was fixed, and $10–20M was at risk if it slipped.

Defeated by a shared mandateDec 2024
The QA bottleneckBoss 2

Every release queued behind QA. With bugs landing on both our side and the AHV team’s, the date was at risk.

+15% QA capacityCycles ~20% shorter

Party

Getting three teams behind one plan

  1. SponsorsDirectors and VPsBacked the project: 2,000 enterprise customers to retain
  2. LeadMe, with the Move teamOne plan, one timeline, one voice to customers
  3. AHVThe core hypervisor and the data path workloads land on NetworkingBrings networks up and down once systems are converted UhuraNutanix running on VMware: where every customer started
  4. For~2,000 enterprise customersRunning Nutanix on VMware ESXi

Same split as the files migration: Move orchestrates the conversion and gives the user control; the AHV team owns the data path. That meant both teams fixing their own bugs, in parallel, against one date.

Upgrades picked

What I did

Run map

How the release ran

  1. TriggerVMware licensing change: full stack or leave
  2. Room 1Director and VP buy-in
  3. Room 2Customer requirements
  4. Room 3Brief AHV, Networking and Uhura
  5. Room 4Common base, work split
  6. Room 5Beta and customer feedback
  7. Room 6 · BossQA and joint bug fixing
  8. ShippedOn time

Dec 2024 · kickoffSep–Oct 2025 · released

Team and loadout

Team and tech

  • Me · technical leadAlignment, planning, customer requirements, delivery
  • Move team2 backend, 1 UI, 1 UX, 1 product manager, 2 QA
  • QA contractorsAdded with two test clusters to clear the bottleneck
  • AHV, Networking, UhuraPartner teams across Nutanix
  • ESXiVMware hypervisor, the start
  • AHVNutanix hypervisor, the goal
  • In-placeSame hardware, no new cluster
  • SeedInitial copy of each VM
  • ΔIncremental delta syncs
  • APIAHV data-path APIs

Move orchestrates; AHV moves the data. Workloads keep running until cutover, so the switch is built for zero downtime.

Replay

See the feature

Nutanix University’s walkthrough of the feature in Move 6.1. Nothing loads from YouTube until you press play.

Achievements unlocked

Highlights

Next save file

Slot 03 · From fleet costs to an adopted routing product