Slot 03 · Valeo Health · Dubai, UAE · Jul – Aug 2026 · Management intern, product and operations
From fleet costs to an adopted routing product
Fleet cost had risen 18% with no more orders served. I traced it from the receipts, won CEO approval for three strategies, then built Logistics Valeo myself and worked alongside operations until it stuck. Orders captured rose to 80–90%, and km per order fell about 25%.
StageClearAdopted
Order servedOrder missedStandby hubIllustrative layout; the km figures are measured.
Results
up from 60–70% of platform orders
km per order, 60 → 45.3
and ~AED 12,400 at marginal cost
for operations to move fully onto it
strategies from the cost diagnosis
Mission
The problem
Valeo Health sends 10–12 nurse–driver pairs to patients’ homes for short visits: sample collection, IV therapy and injections, 50–70 orders a day. Orders arrive on a partner booking platform and go to whichever provider claims them first.
Dispatch claimed orders by hand in Excel and coordinated the ground team at the same time, so many orders were missed. Between visits, idle pairs waited at the office, so the fleet drove long, empty kilometres that nobody could see clearly.
Loot check
Finding the cost nobody could see
- Step 1Rebuilt cost from receiptsWith the accounts team, from every fleet receipt
- Step 2Allocated it by business lineManagerial accounting from my MBA, applied to a real P&L
- FoundFleet cost up 18%With no rise in orders served
Strategies unlocked
Three plans the CEO approved
- Built and liveThree hubs, aligned incentives and a digital app
A 3-hub standby model. The operations team earns AED 50 a day when the team’s km per order is 35–45, and AED 100 below 35. Logistics Valeo runs all sample-collection and IV orders.
- Approved planCombine babysitting and home nursing
Share one fleet and one set of operations managers across both businesses.
- Approved planA digital app for both businesses
Extend the same digital operating model to babysitting and home nursing.
Party
Built with the business, not for it
- Final approvalCEOApproved the three strategies and the launch
- BuilderMe, end to endDiagnosis, product, code, rollout
- CTOFound the booking-platform and internal APIs with me COOSet the business use cases the tool had to cover Ops managerRefined it with me every day after launch
- UsersDispatch and 10–12 nurse–driver pairs50–70 home visits a day
Patch notes
Every objection got an answer
Operations pushed back on every change. Each objection was answered with data or with a shipped change, usually within days.
-
“Why use a tool when the current setup works?”
ProofIt didn’t work: orders were being missed, and dispatch barely had time to claim orders and coordinate the ground team. I showed them the missed orders.
-
“The third hub is barely used; my orders are around hub 2.”
ProofTrue on some days, but the 3-hub model saves money overall. It was fitted on 9 months of historical orders, and I walked them through the data.
-
“I get all the morning orders while other nurses sit idle.”
PatchFair. I changed the roster algorithm to spread morning shifts evenly.
-
“We have too many split shifts.”
PatchThe roster now allows at most two split shifts.
-
Pushback on the auto-accept lead time
PatchLead time moved from 3 to 24 hours, and night hours stopped counting.
Run map
How it ran
- BeforeExcel dispatch, pairs waiting at the office
- Room 1Cost rebuilt from receipts
- Room 2+18% fleet cost found
- Room 3CEO approves 3 strategies
- Room 4Built with CTO and COO
- Room 5Live 1 Aug, daily fixes for 14 days
- Room 6 · BossOperations pushback, answered
- AdoptedIn 1 week
Jul 2026 · diagnosisStill in use after the internship
Loadout
What the tool does
- AutoAccepts the orders the fleet can serve
- DayLive view of every pair’s visits
- RosterBuilds pairs and shifts to cover demand
- Hubs3 standby hubs, from 9 months of orders
- PlanCapacity for each day’s demand
- KPIKm per order, for the incentive
Built in Python and React on the booking platform’s APIs.
The public rebuild on synthetic data, so the logic can be shown. See the code ↗
Achievements unlocked
Highlights
- Adopted in a weekOperations moved fully onto the tool
- Incentive unlockedThe team hit the km target on many days
- Still running after I leftFully used a month later; they asked me to stay on